GATEWAYS IN THE PORT OF COLONIA II
| project | construction | area (m2) | location |
|---|---|---|---|
| 2021-2025 | 2022-2026 | 700 | Uruguay |
This project involves the extension of 130 linear meters of fixed walkway at the Unión pier, a 200 m² distribution building, an additional fixed walkway, and a new double-gangway mobile boarding bridge at the Ultramar pier. The construction features a metal structure with a glass and aluminum composite skin. The scope also includes an 800 m² floating pontoon and the reconstruction of the Unión and Ultramar piers with new fender systems.
Scope of work
Preliminary draft
Construction documents
Clash detection
Designer architect
MARQ - ANP - Administración Nacional de Puertos
Client
STILER
Owner
ANP - Administración Nacional de Puertos
Comments
Project developed by the Stiler – Saceem consortium